Home / Solutions / Synchronization

Synchronization Solutions

Reliable power depends on generation sources working together as one coordinated system. PES designs and implements automatic synchronization systems for multi-generator and grid-parallel operations, built around industry-leading controllers such as the DEIF AGC-4 MKII and AGC-150. From single-genset AMF panels to complex multi-source installations running in parallel with the utility grid, our synchronization solutions ensure stable, reliable power across every operating mode — with the protection and control logic engineered to match your site’s exact load profile and operational requirements.

10MW ENI, Pakistan
10MW ENI, Pakistan
Illustration of automatic synchronization

What we deliver

Multi-Genset Synchronization

Automatic synchronization of multiple generating sets into a single, coordinated power source. Our systems match voltage, frequency, and phase angle before closing, ensuring smooth, damage-free breaker operation and stable bus conditions every time.

Load Sharing & Load Management

Intelligent distribution of active and reactive load across running generators, keeping each unit within its optimal operating band. Automatic load-dependent start/stop brings capacity online only when demand requires it reducing fuel consumption, running hours, and maintenance costs.

Closed-Transition Changeover

Seamless transfer between power sources without interrupting supply to critical loads. By briefly paralleling sources before opening the outgoing breaker, closed-transition changeover eliminates the disruption of open-transition switching for sensitive processes and equipment.

ATS / AMF Logic

Automatic Transfer Switch and Automatic Mains Failure control that detects supply loss, starts standby generation, and transfers load without operator intervention then returns to mains and shuts down safely once stable utility supply is restored.

Protection Coordination

Engineered protection schemes using ANSI-coded functions, coordinated so that the correct device operates first and isolates only the affected section. Proper coordination protects assets, personnel, and supply continuity across the installation.

Grid Interfacing & Parallel Operation

Seamless interfacing with utility grids for import, export, and peak-shaving operation. We engineer the control, protection, and compliance requirements needed for safe, stable parallel running alongside the grid.

Tell us about your site.

Send us the load, the sources and the constraints. An engineer will reply with a clear next step.

Request a quote
Use the arrow keys, press Enter to open, Esc to close.