Home / Case studies / REDCO Lusail Stadium
REDCO Lusail Stadium
Redundant SCADA & controls with Grid/Genset synchronization, weather station and integration into the stadium BMS.

ClientREDCO International
LocationLusail, Qatar
SectorStadiums & Infrastructure
Capacity5.3 MW DC / 4.5 MW AC Solar
5.3MW solar (DC)
How the site is controlled
Single-line view of what PES controls on this site: Solar PV (Grid + Genset Hybrid).
Scope of work
- Redundant SCADA & Control System to manage the complete renewables & synch with Grid & Genset + Complete Supply of weather station
- Integration of complete system in Main BMS
Project details
- Client
- REDCO International
- Sector
- Stadiums & Infrastructure
- Location
- Lusail, Qatar
- Project Type
- Solar PV (Grid + Genset Hybrid)
- Capacity
- 5.3 MW DC / 4.5 MW AC Solar
- Grid / Captive Plant
- DGs & Grid (Kahramaa)
- Key Equipment
- 42× Sungrow 110 kW string inverters
Tell us about your site.
Send us the load, the sources and the constraints. An engineer will reply with a clear next step.
Request a quote

