Home / Case studies / 500MW BASH

500MW BASH – Uzbekistan

Power Plant Controller, NEGU dispatch management and RTU supply for 500 kV & 33 kV grid interconnection.

500MW BASH, Uzbekistan
500MW BASH, Uzbekistan
Client500MW BASH Wind Project
LocationUzbekistan
SectorUtility-Scale Wind
Capacity500 MW Wind
500MW wind

How the site is controlled

PES SCADA and plant controlsWind500 MWGrid500 kV and 33 kV

Single-line view of what PES controls on this site: Wind Farm.

Scope of work

  • Scope of supply & services – Power Plant controller
  • Management of dispatch command by NEGU
  • Supply of RTU for interconnection with 500kV & 33kV Grid

Project details

Client
500MW BASH Wind Project
Sector
Utility-Scale Wind
Location
Uzbekistan
Project Type
Wind Farm
Capacity
500 MW Wind
Grid / Captive Plant
Grid-connected (500 kV & 33 kV)
Key Equipment
108× Envision 4.5 MW wind turbines

Tell us about your site.

Send us the load, the sources and the constraints. An engineer will reply with a clear next step.