Home / Case studies / Soorty Denim
Soorty Denim – Nooriabad
Redundant SCADA & controls with Grid/Genset synchronization, weather station, off-grid operation via BESS and energy arbitrage.

ClientSoorty Denim
LocationNooriabad, Pakistan
SectorTextile
Capacity9 MW DC Solar · 18 MW Wind
9MW solar (DC)
18MW wind
8MWh battery storage
How the site is controlled
Single-line view of what PES controls on this site: Hybrid: Wind + Solar + BESS.
Scope of work
- Redundant SCADA & Control System to manage the complete renewables & synch with Grid & Genset + Complete Supply of weather station
- Off-Grid Mode of complete captive plant through BESS
- Arbitraging through renewable powers
Project details
- Client
- Soorty Denim
- Sector
- Textile
- Location
- Nooriabad, Pakistan
- Project Type
- Hybrid: Wind + Solar + BESS
- Capacity
- 9 MW DC Solar · 18 MW Wind
- Grid / Captive Plant
- 36 MW captive plant (Grid, HFOs, Gas Gensets & WHRP)
- Energy Storage
- 8 MWh BESS · 8 MW PCS (Huawei)
- Key Equipment
- Sungrow PV inverters (6 groups) · 4× 4.5 MW WTGs
Tell us about your site.
Send us the load, the sources and the constraints. An engineer will reply with a clear next step.
Request a quote

