Home / Case studies / UNAMI, 7 sites
7x Sites UNAMI – Iraq
Standalone SCADA & controls, ENOC central monitoring, grid forming with soft start for 11 kV transformers, automatic DG start/stop, SOC management and solar firming.

ClientUNAMI (United Nations Assistance Mission for Iraq)
LocationIraq (7 sites)
SectorInternational Organisations
Capacity6.0 MW DC / 5.6 MW AC Solar
6MW solar (DC)
5.3MWh battery storage
How the site is controlled
Single-line view of what PES controls on this site: Solar + BESS (Diesel Hybrid).
Scope of work
- Standalone SCADA & Control System to manage the complete renewables & synch with Genset + Complete Supply of weather station
- ENOC system for central monitoring of all sites
- Grid Forming with Soft Start function to energize 11kV trafos.
- Automatic Start/Stop of DGs upon failure of Grid
- SOC management
- Solar Firming
Project details
- Client
- UNAMI (United Nations Assistance Mission for Iraq)
- Sector
- International Organisations
- Location
- Iraq (7 sites)
- Project Type
- Solar + BESS (Diesel Hybrid)
- Capacity
- 6.0 MW DC / 5.6 MW AC Solar
- Grid / Captive Plant
- Diesel gensets + Grid
- Energy Storage
- 5.3 MWh BESS
- Key Equipment
- 38× Kehua-tech 100 kW string inverters