Home / Case studies / NEOM Village, 4 sites

NEOM Village 4x Sites

Redundant SCADA & controls with Grid/Genset synchronization, off-grid operation via BESS, automatic DG start/stop, SOC management and solar firming.

NEOM Village, 4 sites, NEOM, Saudi Arabia (4 sites)
NEOM Village, 4 sites, NEOM, Saudi Arabia (4 sites)
ClientNEOM
LocationNEOM, Saudi Arabia (4 sites)
SectorInfrastructure & Communities
Capacity6 MW DC / 5.4 MW AC Solar
6MW solar (DC)
6MWh battery storage

How the site is controlled

PES SCADA and plant controlsSolar PV6 MW DCBattery6 MWhGeneratorsGensets

Single-line view of what PES controls on this site: Solar + BESS (Diesel Hybrid).

Scope of work

  • Redundant SCADA & Control System to manage the complete renewables & synch with Grid & Genset + Complete Supply of weather station
  • Off-Grid Mode of complete captive plant through BESS
  • Arbitraging through renewable powers
  • Automatic Start/Stop of DGs upon failure of Grid
  • SOC management
  • Solar Firming

Project details

Client
NEOM
Sector
Infrastructure & Communities
Location
NEOM, Saudi Arabia (4 sites)
Project Type
Solar + BESS (Diesel Hybrid)
Capacity
6 MW DC / 5.4 MW AC Solar
Grid / Captive Plant
24× DGs per site
Energy Storage
6 MWh BESS · 6 MW PCS (Huawei)
Key Equipment
18× Alfanar 255 kW string inverters