Home / Case studies / NEOM Village, 4 sites
NEOM Village 4x Sites
Redundant SCADA & controls with Grid/Genset synchronization, off-grid operation via BESS, automatic DG start/stop, SOC management and solar firming.

ClientNEOM
LocationNEOM, Saudi Arabia (4 sites)
SectorInfrastructure & Communities
Capacity6 MW DC / 5.4 MW AC Solar
6MW solar (DC)
6MWh battery storage
How the site is controlled
Single-line view of what PES controls on this site: Solar + BESS (Diesel Hybrid).
Scope of work
- Redundant SCADA & Control System to manage the complete renewables & synch with Grid & Genset + Complete Supply of weather station
- Off-Grid Mode of complete captive plant through BESS
- Arbitraging through renewable powers
- Automatic Start/Stop of DGs upon failure of Grid
- SOC management
- Solar Firming
Project details
- Client
- NEOM
- Sector
- Infrastructure & Communities
- Location
- NEOM, Saudi Arabia (4 sites)
- Project Type
- Solar + BESS (Diesel Hybrid)
- Capacity
- 6 MW DC / 5.4 MW AC Solar
- Grid / Captive Plant
- 24× DGs per site
- Energy Storage
- 6 MWh BESS · 6 MW PCS (Huawei)
- Key Equipment
- 18× Alfanar 255 kW string inverters
Tell us about your site.
Send us the load, the sources and the constraints. An engineer will reply with a clear next step.
Request a quote

