Home / Case studies
Case studies
Redundant and standalone SCADA and control systems delivered across cement, textile, utility, stadium and infrastructure projects. Open any project to see what PES controls on site.
Projects shown13
Countries10
Solar and wind in these projects676 MW
Battery storage41 MWh
500 MW500MW BASH
Uzbekistan, Utility-Scale Wind
500 MW wind
59 MWLucky Cement
Nooriabad, Pakistan, Cement & Manufacturing
31 MW solar, 28 MW wind, 8 MWh battery
27 MWSoorty Denim
Nooriabad, Pakistan, Textile
9 MW solar, 18 MW wind, 8 MWh battery
22 MW22MW Naghlu
Naghlu, Afghanistan, Utility-Scale Solar
22 MW solar
18 MWLiberty Textile
Pakistan, Textile
9 MW solar, 9 MW wind, 8 MWh battery
10 MW10MW ADRA
Adra, Syria, Utility-Scale Solar
10 MW solar
10 MW10MW ENI
Pakistan, Oil & Gas
10 MW solar
6 MWUNAMI, 7 sites
Iraq (7 sites), International Organisations
6 MW solar, 5.3 MWh battery
6 MWEmerge Masdar
Masdar, UAE, Commercial & Industrial Energy
6 MW solar, 6 MWh battery
6 MWNEOM Village, 4 sites
NEOM, Saudi Arabia (4 sites), Infrastructure & Communities
6 MW solar, 6 MWh battery
5.3 MWREDCO Lusail Stadium
Lusail, Qatar, Stadiums & Infrastructure
5.3 MW solar
4.3 MW
Dhakla Oasis
Dhakla Oasis, Egypt, Off-Grid Power
4.3 MW solar
2.3 MWDakar Stadium
Dakar, Senegal, Stadiums & Infrastructure
2.3 MW solar
No project matches. Clear the search or pick another technology.
Tell us about your site.
Send us the load, the sources and the constraints. An engineer will reply with a clear next step.
Request a quote